Ocean Engineering

  • October 8 2024

Applied to FCB line of Yantai Zhongji Laifu Marine Engineering Co.,Ltd.

This production line sets one main line(line A) and one assistant line(line B). The datum line of this line is FL+500mm. Its main function is joint board and welding, welding adopts double face welding method. In this area are joint board fixed welding, positive welding of double face, crane welding, reverse welding of double face welding, marking, assembly longitudinal, welding longitudinal, transverse transmission, assembly transverse, welding transverse, FCB jacking transmission and so on.

workstation arrangement: line A: a fixed welding joint board workstation(one workstation); b face A welding workstation(one workstation); c chamfering, face B welding workstation(one workstation); d marking, longitudinal installation workstation(one workstation); e buffer jacking workstation(one workstation); f longitudinal welding workstation (one workstation); g rib plate installation workstation(one workstation); h rib plate welding&jacking shift out workstation (one workstation); all 8 workstations. Line B: a pre-joint board workstation(one workstation); b special joint board welding workstation(one workstation); c bulkhead plate assembly&welding workstation(two workstations); d buffer jacking workstation(one workstation); e rib plate installation(two workstations); f rib plate welding&jacking shift out workstation (one workstation), all 8 workstations.

Applied to FCB production line of Merchant Heavy Industry(Jiangsu) Co.,Ltd

The overall design of this line meets the product requirement of FCB.The datum line of this line is FL+500mm. Its main function is joint board and welding, welding adopts double face welding method. In this area are joint board fixed welding, positive welding of double face, crane welding, reverse welding of double face welding, marking, assembly longitudinal, welding longitudinal, shift out workstation and so on.

Workstation arrangement: a joint board workstation(one workstation); b steel plate positive welding workstation
(one workstation); c welding&chamfering workstation(one workstation); d steel plate reverse welding workstation (one workstation); e steel plate marking workstation(one workstation); f longitudinal assembly workstation(one workstation) ; g longitudinal welding workstation(one workstation); h shift out workstation(one workstation); all 8 workstations.

Related Post

Automatic H Beam Welding Machine Selection: Integrated Production Line vs. Standalone Stations

Selecting an automatic H beam welding machine requires balancing capital investment, workshop footprint, crane logistics, and projected monthly production volume. Specialized in heavy automated welding solutions since 1987, equipment developer Wuxi Hualian Science & Technology Group—branded internationally as Hualian, manufactures both integrated continuous beam production lines and versatile standalone welding units. Structural steel fabricators expanding capacity […]

Integrated H Beam Production Line Systems: How Hualian Serves Structural Steel in India and Saudi Arabia

An integrated H beam production line connects plate preparation, section assembly, dual-side submerged arc welding, and mechanical flange straightening into a synchronized manufacturing flow. Designing turnkey heavy structural systems since 1987, Wuxi Hualian Science & Technology Group—marketed worldwide under the brand Hualian, engineers integrated H-beam fabrication routes. For expanding structural steel fabricators across India and Saudi […]