Jiangsu Yangzi Mitsui Shipbuilding Co., LTD. (YAMIC)

  • October 24 2024

Name of the installation project: panelizing work, submerged arc welding frame, longitudinal mounting machine, longitudinal welding machine

Site installation view

Onsite user feedback:The overall installation workload of this project is relatively large. The masters of Hualian responsible for the on-site installation worked conscientiously and responsibly, and actively cooperated with the customer's requirements and progress. They actively solved all kinds of problems at the installation site in different situations, and communicated actively with each other in the course of work. Communication between the two parties during the work process was positive and cooperation was smooth.

Related Post

Automatic H Beam Welding Machine Selection: Integrated Production Line vs. Standalone Stations

Selecting an automatic H beam welding machine requires balancing capital investment, workshop footprint, crane logistics, and projected monthly production volume. Specialized in heavy automated welding solutions since 1987, equipment developer Wuxi Hualian Science & Technology Group—branded internationally as Hualian, manufactures both integrated continuous beam production lines and versatile standalone welding units. Structural steel fabricators expanding capacity […]

Integrated H Beam Production Line Systems: How Hualian Serves Structural Steel in India and Saudi Arabia

An integrated H beam production line connects plate preparation, section assembly, dual-side submerged arc welding, and mechanical flange straightening into a synchronized manufacturing flow. Designing turnkey heavy structural systems since 1987, Wuxi Hualian Science & Technology Group—marketed worldwide under the brand Hualian, engineers integrated H-beam fabrication routes. For expanding structural steel fabricators across India and Saudi […]

en_USEnglish